Dikchu Hydro Electric Project (96 MW)
Client: Haridwar Infrastructure Private Limited
Services:
For providing consultancy services for Detailed Design and Drawings in respect of Civil Engineering works, Hydro Mechanical works and Electro Mechanical works; Transmission lines and preparation of Technical Specification
Project Details:
|
Location
|
Near Village Lingdok in the East and North District of Sikkim
|
|
Total Catchment area at Dam site
|
240 sq km
|
|
Installed Capacity
|
96 MW
|
|
Dam
|
115.79 m length, Concrete Gravity Dam
|
|
Diversion
|
5.5 m (L) X 3 m (W)
|
|
Spillway
|
Ogee Shape spillway, 6 m (W) x 6.85 m (H)
|
|
Pressure Shaft
|
1 No., 3 m dia, 548 m length, Underground
|
|
Tailrace Tunnels
|
D-Shaped, 4.0 m dia., 297.0 m length
|
|
Power Tunnel
|
4.80 m dia Horse shoe, 273.00 m length
|
|
Powerhouse
|
2 Nos., Vertical Axis Francis Turbine, Underground
|
|
Penstock
|
2 Nos., 2.10 m dia
|
|
Desilting Chamber
|
1No, 250 m (L) x12 m (W) x15.5 m (H)
|
|
Head Race Tunnel
|
1No. 4.8 m dia., 5.45 km approx. length, Horse Shoe Shaped
|
|
Surge Shaft
|
10.5 m diameter, restricted orifice type
|
|
Switchyard
|
Open, 60 m x30 m
|
Present Status of the Project:
· 98% of planning of all components including location & orientation of Dam, Powerhouse and alignment of Head Race Tunnel has been finalized.
· 25% of design and drawings for all components has been completed.
· 80% of design of HM works including specifications has been completed.
· E&M Schemes for project finalized and 10% of Drawings & Documents for E&M Equipment & System completed.
|