Dikchu Hydro Electric Project (96 MW)
Client:             Haridwar Infrastructure Private Limited
Services:                                           
For providing consultancy services for Detailed Design and Drawings in respect of Civil Engineering works, Hydro Mechanical works and Electro Mechanical works; Transmission lines and preparation of Technical Specification
Project Details:

Location
Near Village Lingdok in the East and North District of Sikkim
Total Catchment area at Dam site
240 sq km
Installed Capacity
96 MW
Dam
115.79 m length, Concrete Gravity Dam
Diversion
5.5 m (L) X 3 m (W)
Spillway
Ogee Shape spillway, 6 m (W) x 6.85 m (H)
Pressure Shaft
1 No., 3 m dia, 548 m length, Underground
Tailrace Tunnels
D-Shaped, 4.0 m dia., 297.0 m length
Power Tunnel
4.80 m dia Horse shoe, 273.00 m length
Powerhouse
2 Nos., Vertical Axis Francis Turbine, Underground
Penstock
2 Nos., 2.10 m dia
Desilting Chamber
1No, 250 m (L) x12 m (W) x15.5 m (H)
Head Race Tunnel
1No. 4.8 m dia., 5.45 km approx. length, Horse Shoe Shaped
Surge Shaft
10.5 m diameter, restricted orifice type
Switchyard
Open, 60 m x30 m

 
Present Status of the Project:
·          98% of planning of all components including location & orientation of Dam, Powerhouse and alignment of Head Race Tunnel has been finalized.
·          25% of design and drawings for all components has been completed.
·          80% of design of HM works including specifications has been completed.
·          E&M Schemes for project finalized and 10% of Drawings & Documents for E&M Equipment & System completed.