Gongri Hydroelectric Project (144 MW)
Client:
Dirang Energy Private Limited
Services:
For providing engineering consultancy services for review and upgrading Detailed Project Report of the project and providing assistance in obtaining Techno-economic Clearances of the DPR from Central Electricity Authority (CEA).
Details of the Project:
|
Location
|
Barrage site is located in the Dirang town in West Kameng District of Arunachal Pradesh
|
|
Total Catchment area
|
1039 km2
|
|
Installed Capacity
|
2 x 72 MW = 144 MW
|
|
Barrage Spillway
|
29.0 m high, with 2 Under Sluice Bays with radial gate of size 9.5 m x 14.00 m and 2 no’s of spillway Bay with radial gate of size 9.5 m x 14.00 m
|
|
Power Intake
|
Design Discharge 101.20 m3/s (84.33 m3/s for power generation + 16.87 m3/s for silt flushing)
|
|
Desilting Chamber
|
2 Nos., Size 260.0m (L) x 13.0m (W) x 16.0m (H)
|
|
Head Race Tunnel
|
5.80 m Modified Horse Shoe, Length 7140 m
|
|
Surge Shaft
|
Underground, Dome shaped restricted orifice Vertical Shaft with diameter of 13.0m
|
|
Pressure Shaft
|
Diameter 4.40m, Length 660 m
|
|
Powerhouse
|
Surface, size 64.00m (L) x 20.50m (B) x 47.20m (H)
|
|
Tailrace Channel
|
Length 152.62 m, width 23.00m
|
Present Status of the Project:
· Detailed Project Report submitted to CEA on July 2011
|