Jorethang Hydro Electric Project (96 MW)
Client: DANS Energy Private Limited
Services:
For providing consultancy services for Detailed Design and Drawings in respect of Civil Engineering works and review of Hydro Mechanical and Electro Mechanical works.
Project Details:
|
Location
|
South/West Districts of Sikkim
|
|
Total Catchment area at Barrage site
|
1384 sq. km.
|
|
Installed Capacity
|
96 MW
|
|
Diversion Barrage
|
Height – 15 m
Length b/w abutments – 99 m
7 Spillway bays, 2 Under Sluice bays
|
|
Power Intake
|
5.0 m (W) x 6.5 m (H)
|
|
Head Race Tunnel
|
1 No., 7.0 m dia., 6.78 km approx. length, Modified Horseshoe Shaped
|
|
Surge Shaft
|
25.0 m diameter, restricted orifice type
|
|
Pressure Shaft/Penstock
|
1 No., 6 m dia., 172.6 m length
|
|
Branch Penstock
|
2 Nos., 4.25 m dia.
|
|
Tail race channel
|
Cut & Cover Conduit, 46.4 m length
|
|
Powerhouse
|
Surface, 2 Nos., Vertical Axis Francis Turbine
|
|
Switchyard
|
Outdoor, 53 m X 42 m
|
Present Status of the Project:
· 90% of planning of all components including location & orientation of Barrage, Power House and alignment of Head Race Tunnel and Penstock has been finalized.
· 15% of design and drawings for all components has been completed.
|
|