Jorethang Hydro Electric Project (96 MW)
Client: DANS Energy Private Limited
Services:                                           

For providing consultancy services for Detailed Design and Drawings in respect of Civil Engineering works and review of Hydro Mechanical and Electro Mechanical works.

Project Details:

Location
South/West Districts of Sikkim
Total Catchment area at Barrage site
  
1384 sq. km.
Installed Capacity
96 MW
Diversion Barrage
Height – 15 m
Length b/w abutments – 99 m
7 Spillway bays, 2 Under Sluice bays
Power Intake
5.0 m (W) x 6.5 m (H)
Head Race Tunnel
1 No., 7.0 m dia., 6.78 km approx. length, Modified Horseshoe Shaped
Surge Shaft
25.0 m diameter, restricted orifice type
Pressure Shaft/Penstock
1 No., 6 m dia., 172.6 m length
Branch Penstock
2 Nos., 4.25 m dia.
Tail race channel
Cut & Cover Conduit, 46.4 m length
Powerhouse
Surface, 2 Nos., Vertical Axis Francis Turbine
Switchyard
Outdoor, 53 m X 42 m
 
 
Present Status of the Project:
·          90% of planning of all components including location & orientation of Barrage, Power House and alignment of Head Race Tunnel and Penstock has been finalized.
·          15% of design and drawings for all components has been completed.