Kholongchu Hydro Electric Project (486 MW):
|
|
|
Client: Satluj jal Vidyut Nigam Limited
|
|
|
|
Services:
For Preparation of Feasibility Study Report (FSR) and Detailed Project Report (DPR) including Investigation Works for the project.
|
|
Details of the Project:
|
|
|
|
Location:
|
Dam site is located approximately 6Km along the river upstream of Kholongchu-Gamrichhu confluence(Duksum).
|
|
Total Catchment area at Dam site
|
1134 km2
|
|
Installed Capacity
|
4 x 121.5 MW = 486 MW
|
|
Dam
|
Concrete Gravity Dam, Height 51m..
|
|
Spillway
|
Ogee type, crest level 1180 m.a.s.l.
|
|
Pressure Shaft
|
4 nos. of Pressure Shaft of 3 m Dia and 480 m length...
|
|
Head Race Tunnel
|
5.9 KM Head race Tunnel with a cross sectional area of 90.92m2
|
|
Tailrace
|
400 m Tunnel
|
|
Powerhouse
|
Under ground powerhouse on right bank.
|
|
Turbine
|
4 Nos. Vertical Francis Turbine
|
|
Transmission Line
|
120 Km Transmission line
|
|
90% dependable firm energy
|
512 GWh
|
|
|
|
|
|
|
|
|
|
|
|
|