Kholongchu Hydro Electric Project (600MW)
 
Client:
Satluj Jal Vidyut Nigam Limited
Services:
For Preparation of Feasibility Study Report (FSR) and Detailed Project Report (DPR) including Investigation Works for the project.
Details of the Project:

Location
Dam site is located approximately 6km along the river upstream of Kholongchu-Gamrichhu confluence (Duksum)
Total Catchment area at diversion site
1044 km2
Installed Capacity
4 x 150 MW = 600 MW
Dam
Concrete Gravity Dam, Height 62m above river bed
Spillway
Ogee with Sluice type (Lower Tier)
Ogee with Open Crest (Upper Tier) 
Pressure Shaft
Two nos, 3.30 m dia,1320 m long circular pressure shafts each bifurcated to two nos, 2.35 m dia, to feed four units
Head Race Tunnel
5.70 m Φ Horse Shoe Shaped, Length 15.77m
Tailrace
4 No’s, 3.50 m (W) x 6.00 m (H) D- Shaped Unit TRT converging into 6.00 m (W) x 6.00 m (H) D shaped single TRT, 1450 m long, to outfall on right bank of Dramengchu (Gongrichu)
Powerhouse
Underground powerhouse on right bank.
Turbine
Pelton, 4 units of 150 MW each
Transmission Line
120 Km Transmission line
90% dependable firm energy
2568.88 MU

 
Present Status of the Project:

Drilling work completed at site.
The PH drift excavation on revised PH location progressed up to 110 m out of  drifting length of 265 m. 
Detailed Project Report prepared by EIPL is under review. Approval of Detailed  
Project Report from CEA is awaited