Kholongchu Hydro Electric Project (600MW)
Client:
Satluj Jal Vidyut Nigam Limited
Services:
For Preparation of Feasibility Study Report (FSR) and Detailed Project Report (DPR) including Investigation Works for the project.
Details of the Project:
|
Location
|
Dam site is located approximately 6km along the river upstream of Kholongchu-Gamrichhu confluence (Duksum)
|
|
Total Catchment area at diversion site
|
1044 km2
|
|
Installed Capacity
|
4 x 150 MW = 600 MW
|
|
Dam
|
Concrete Gravity Dam, Height 62m above river bed
|
|
Spillway
|
Ogee with Sluice type (Lower Tier)
Ogee with Open Crest (Upper Tier)
|
|
Pressure Shaft
|
Two nos, 3.30 m dia,1320 m long circular pressure shafts each bifurcated to two nos, 2.35 m dia, to feed four units
|
|
Head Race Tunnel
|
5.70 m Φ Horse Shoe Shaped, Length 15.77m
|
|
Tailrace
|
4 No’s, 3.50 m (W) x 6.00 m (H) D- Shaped Unit TRT converging into 6.00 m (W) x 6.00 m (H) D shaped single TRT, 1450 m long, to outfall on right bank of Dramengchu (Gongrichu)
|
|
Powerhouse
|
Underground powerhouse on right bank.
|
|
Turbine
|
Pelton, 4 units of 150 MW each
|
|
Transmission Line
|
120 Km Transmission line
|
|
90% dependable firm energy
|
2568.88 MU
|
Present Status of the Project:
Drilling work completed at site.
The PH drift excavation on revised PH location progressed up to 110 m out of drifting length of 265 m.
Detailed Project Report prepared by EIPL is under review. Approval of Detailed
Project Report from CEA is awaited
|
|