Demwe Upper Hydroelectric Project (1800 MW)
Client:
Athena Demwe Power Private Limited
 

Services:

Pre-construction stage investigations, preparation of Pre-Feasibility Report, preparation of Detailed Project Report, Preparation of tender documents and drawings, assistance in acquisition of clearances, assistance in bid and award of EPC Contract, Detailed Design, Construction services and Project Management.

Details of the Project:
 
Location: Dam site is  located in  District Anjaw  near Mompani village of Arunachal Pradesh.
Total Catchment area at Dam site

20,560km2

Installed Capacity  6 x 300 MW = 1800 MW
Dam Concrete Gravity Dam, Length of the dam at top is 532m.
Spillway Ogee with breast wall
Diversion Tunnels 2 Nos – 12.8 m diameter circular tunnels on the  Left bank.
Pressure Shaft 6 Nos. 7.0m diameter, underground with a vertical  shaft of 119 m height reduced to  5.5m diameter near MIV. The shafts are 7.0m diameter the length of this shafts are mention below.
(a). 7.0 m diameter. 350m (average)
 (b). 5.5 m diameter. 40m (average)
Tailrace Tunnel 6 Nos. Circular 9m diameter,108m long each upto Tail water Collection Gallery 3 Nos. Circular 11.5m diameter, 446 to 541 m long (length varies) each from Tail water Collection Gallery to outfall. 
Powerhouse Under ground powerhouse on right bank.
MIV Cavern: 31m length x 12m width x 23m height.
Machine Hall Cavern 204.50m length x 24m width x 52.75 height.
Transformer Cavern 167.5m length x 16m width x 28.5m height.
Tail race Tunnel 6 Nos. Circular 9m diameter, 108m long.
Turbines Vertical Francis, 6 unit of 300 MW each.
 
 
 